Are you planning on remodeling your bathroom but want to do it on your own? Here are some steps on installing your new tiles perfectly to make your bathroom look better. 

1. Measurement 

In order to start the process of installing new tiles on your bathroom floor, measure the floor area of your bathroom to know the amount of tile, grout, backing board and mortar are needed. To ensure that you are being efficient on your costs, buy the right amount for your bathroom remodel. This also reduce mismatching risks by buying all the materials in the same batch. 

2. Underlayment 

To ensure a that you have a level surface and a sturdy one that your tiles can easily be attached to means you need to install an underlayment. Through a saw, make a cut specific to the measurement you got when you measured your bathroom floor area. 

3. Attaching the underlayment 

To attach the underlayment, grab a drill to ensure your screws are attached into the sub floor of your underlayment. The screws should be apart by 6 inches. Moreover, ensure that the surface is flat.  

4. Tile layout 

To ensure that the tiles fit well with uniform spacing, start with the edges. Once you are done with the edges, use the tile spacers to make sure that the space in between your tiles is uniform. After seeing your layout and you are happy about it, measure the tiles that needs cutting.  

5. Tile cutting 

Tile saw is used when cutting the tiles for your bathroom floors. It is a tool that is necessary to complete your bathroom remodel project. 

6. Place the tiles that have been cut 

To complete the layout of your tiles, place the tiles that you have cut and make sure that after placing it, the spacing is still even afterwards. Make sure that you like what you see. After making sure that you are pleased with the outcome, remove the tiles and apply the thinset.  

7. Apple the thinset mortar 

Through a notched towel, apply a thin layer of the thinset mortar on the underlayment in sections and attach your tiles.   

8. Allow to dry 

After every tile is in place, let the mortar dry for a day. 

9. Grout application 

After the applied mortar has dried, remove the spacers. Prepare the grout mixture and fill the spaces in between your bathroom tiles.  

10. Wipe the excess of the grout applied 

After making sure that the grout you applied has dried out, grab a sponge that is damp to wipe the excess grout away. Doing this leaves your tiles clean and your grout to be leveled. If you skip this step, your floors will suffer from grout haze and it can be a difficult task in the future if left unattended. 

11. Use a grout sealer 

To protect your grout, use a grout sealer. This should be done after ensuring that the grout applied has been dried out.  

For your bathroom remodel needs, make sure that if you need help you call a professional. Looking for one? Bathroom remodeling contractor in Torrance will help you with it. Connect with them today!